Fence Post Concrete Calculator

Count posts from fence runs and gates, then estimate concrete and gravel.

Metric unit converter

Convert your measurements into the units shown on the calculator, or convert a result to metric.

Count posts from runs and gates

Enter an open chain of straight runs in order, starting at one end. Each junction shares one corner post. For separate sections or a closed loop, enter post groups manually.

One per line: run number, distance from the start of that run (ft), opening width (ft). Place gates inside a run, with space at each end.

Applying the count creates new groups with example hole dimensions. Adjust each group to match your project.

Post counts and hole sizes

Enter separate groups when line, corner, or gate posts use different holes.

Bag yield and allowances

Replace the default yield with the value printed on your bag.

How the estimate works

For each round hole, subtract the cross-sectional area of the square post from the area of the hole. Multiply the result by the hole depth minus the gravel thickness. This assumes the post sits on top of a full-width gravel base. Use the actual measured post width. A nominal wood 4×4 often measures 3½ inches across.

Add the concrete volume for all groups, apply the allowance, divide by the yield per bag, then round up once. If you mix one hole at a time and discard leftover mix, your job may require more bags.

Formula for a round hole and square post

Concrete per hole (ft³) = [π × (hole diameter ÷ 2)² − post width²] × (hole depth − gravel thickness) ÷ 1,728. Enter all dimensions in inches.

Gravel per hole (yd³) = π × (hole diameter ÷ 2)² × gravel thickness ÷ 46,656. The base fills the full width of the hole.

Worked example: an L-shaped fence with one gate

  1. Enter two connected runs of 16 ft and 9 ft, with up to 8 ft between posts. Put a 4 ft gate 6 ft from the start of the first run. The fence spans on either side of that gate are each 6 ft, so neither needs an intermediate post. The 9 ft run needs one line post.
  2. The layout gives 6 posts: 2 ends, 1 corner, 2 gate posts and 1 line post. The two runs share the corner post.
  3. For this example, all posts are 3½ in wide. Use 10 in holes for the four non-gate posts and 12 in holes for the two gate posts. Each hole is 30 in deep with a 6 in gravel base. These are example dimensions for estimating quantities.
  4. The holes take 6.48 ft³ of concrete before the allowance. With 10% extra and a yield of 0.45 ft³ per 60 lb bag, buy 16 bags of concrete and 0.08 yd³ of gravel.

Concrete bags by bag weight and yield

Shopping list for the six-post example, including 10% extra concrete
Bag weightYield (ft³)Bags to buy
40 lb0.324
50 lb0.37520
60 lb0.4516
80 lb0.612

Yields are example values. Use the yield on your specific product label.

Should I round up per hole or for the whole project?

Round once across the project if you can share leftover mix between holes. The six-post example takes 16 bags that way. If you use whole bags at each hole and discard the excess, rounding each hole separately gives 20 bags with the same allowance and bag yield.

Can I estimate a closed fence or a gate at a corner?

Enter post counts manually for closed loops, separate sections or gates that share a corner or end post. Group posts by hole size and count each physical post once.

How many bags of concrete do I need per fence post?

For a 10 in diameter, 30 in deep hole with a 6 in gravel layer and a 3½ in square post, plan on three 60 lb bags per hole at 0.45 ft³ per bag and 10% extra. Combined pours can require fewer bags.

Does gravel reduce the amount of concrete I need?

Yes. The model subtracts the gravel layer from the depth available for concrete. It assumes the post sits on the full-width gravel base.

Why do posts of the same size need different amounts of concrete?

The hole diameter and concrete depth determine the space around the post. A gate or corner post can use more concrete if its specified hole is larger.

Use this for material quantities. Check the product label and local requirements before choosing hole dimensions and post spacing.

Sources and assumptions

  • The model uses measured round holes, square posts and a full-width gravel layer under the post.
  • The bag presets are example mixed yields, such as those in the QUIKRETE Concrete Mix technical sheet. Check the bag label and the supplier’s gravel order increment.

When gate holes change the bag order

Count gate posts as their own group when the plan specifies a wider or deeper hole. Where post width and gravel depth stay the same, the hole’s cross-sectional area grows with the square of its diameter. A 12 in hole has 44% more gross cross-sectional area than a 10 in hole. The change in net concrete area can be larger because the same post occupies space in both holes. A project-wide average diameter can hide this effect. Count ends and corners only once, especially when the same post serves two connected runs.

Separate hole depth from the gravel layer

Measure total depth from the intended top of the pour to the bottom of the excavation. This model assumes a full-width gravel layer below a square post. If you measure only the concrete portion first, add the gravel depth before entering a total depth, or leave the gravel input at zero when estimating that concrete portion alone. Where posts extend into the gravel or holes flare at the bottom, the idealized geometry differs from the actual site. Take measurements from representative holes and split any changed geometry into a separate group.

Plan around the mixing sequence

Write down whether all posts will be set from the same batch or each hole will be mixed individually. For a shared batch, keep unrounded volume for each post group and round after adding the groups. For individual batches, use a one-post estimate for each hole type, round each to whole bags, and multiply by the number of holes. This distinction matters for small holes: even a small fraction past two bags requires a third bag when excess mix cannot be carried to the next hole. Confirm the mix’s working time from its label before relying on a shared batch.

Another project to check

A 5½ in square gate post sits on 6 in of gravel in a 14 in diameter hole, 36 in deep overall. The concrete fills 2.147 ft³. With 5% extra and a product yield of 0.60 ft³ per 80 lb bag, buy 4 bags for that hole.